- Location: Rishon LeZion, Mesubim Interchange and Kiryat Aryeh, Petah Tikva
- Client: Igudan – Dan Regional Association for Environmental Infrastructure
- Established: 2005-2010
- Budget: $15,000,000
- Project Description:
Construction of three pumping stations – M0, M1, M2 – and electromechanical systems for three pumping stations, including gate valves up to 60" in diameter, steel and GRP plumbing, high, low, and very low-voltage systems, diesel generator, and synchronizing boards, as well as supply and installation of dozens of water pumps with up to 4,500m3 capacity.